Image

Right text
As part of Tradebe, we have full access to our high temperature incineration plant in Fawley.
The Fawley Thermal Treatment Centre is leading the way in providing a sustainable solution for the treatment and disposal of waste from NORM industrial activities.
- EPR Permit for High Temperature Incineration of Hazardous Waste with a capacity of 45,000 t.p.a.
- ERP10/RSR Permit for Incineration of Radioactive Waste
- A sustainable alternative to disposal of Low Level Waste Repository (LLWR).
- Supporting National Policy on disposal of radioactive waste
Our incinerator complies with all European legal and environmental requirements and is a cost effective means of securely disposing of waste from NORM industrial activities.
BAT treatment includes, but is not limited to the the following waste types:
- Oily Sludges
- Scale and Silts
- Drilling Mud's
- Contaminated PPE
- Filters
- Plastic Pipe work
For more information on our high temperature incineration services contact:
Tel: +44 (0) 1224 571491
enquiries@scotoil.co.uk